Res 26-035 -Arbor Hills Detention Basin Acceptance

File # RES 26-035Ver. 1ResolutionIntroduced May 14, 2026by Public Works: Engineering Department
Sign in to save
Passed
Passed May 25, 2026

Alerts

Sign in to get an email when this item moves: new agenda appearance, attachment added, status change, or vote recorded.

Sign in to follow →

Ask about this resolution

History 1 record

Date Ver. Body Action Result Video
May 25, 2026 1 City Council Passed7-0 Details →

Full text version 1

Show ordinance text (800 chars)
Title Action on Resolution 26-035, a Resolution accepting ownership of Detention Basins located at the Arbor Hills Subdivision. Body Summary and Recommended Action: The developer of Arbor Hills has constructed and maintained two detention basins in accordance with the City's Detention Basin Acceptance Policy. These basins capture and detain a significant amount of stormwater runoff from the City's right-of-way, helping to mitigate downstream flooding impacts associated with the development. It is in the City's best interest to accept ownership of the detention basins to ensure they are properly maintained and continue to operate as designed in managing right-of-way stormwater runoff. Staff recommends approval of the proposed Resolution. Body2 Attachments: Memo Resolution Map