27th Street Channel to E9 Canal Preliminary Design - Professional Engineering Services

File # AR-2026-0111Ver. 1Other Business ItemIntroduced Apr 8, 2026by Environmental Services
Sign in to save
Agenda Ready

Alerts

Sign in to get an email when this item moves: new agenda appearance, attachment added, status change, or vote recorded.

Sign in to follow →

Ask about this other business item

History 1 record

Date Ver. Body Action Result Video
May 3, 2026 1 City Council Passed5-0 Details →

Full text version 1

Show ordinance text (1,962 chars)
COUNCIL AGENDA ITEM SUBJECT: title 27th Street Channel to E9 Canal Preliminary Design - Professional Engineering Services body DEPARTMENT: Public Works & Utilities SUMMARY: The City of Edgewater Stormwater Master Plan identifies the need to improve drainage capacity by connecting the 27th Street Channel to the E9 Canal and ultimately to the Silver Palm Canal west of Florida Shores. This proposed connection will provide additional drainage conveyance for the E9 Canal toward Turnbull Hammock while maintaining its existing discharge at the 18th Street Canal. This agenda item seeks approval of a task order with Mead & Hunt, Inc. for preliminary engineering services associated with this project. The scope of work includes data collection, surveying, hydrologic and hydraulic modeling, conceptual design alternatives, stakeholder coordination, and preparation of a Preliminary Design Report (PDR). The project will evaluate up to three conceptual design alternatives, including a primary alignment along the 27th Street right-of-way and potential alternative routes to optimize cost and constructability. The design will address roadway crossings, drainage improvements, and infrastructure impacts, while incorporating stakeholder input throughout the process. The preliminary design phase is anticipated to take approximately five (5) months to complete and will establish the foundation for future final design, permitting, and construction phases. The total not-to-exceed cost for the preliminary design services is $135,001. BUDGETED ITEM: ? Yes ? No ? Not Applicable BUDGET AMENDMENT REQUIRED: ? Yes ? No ? Not Applicable This is included in budget resolution on the agenda. RECOMMENDED ACTION: Approve the Task Order with Mead & Hunt, Inc. for professional engineering services in the amount of $135,001 for the 27th Street Channel to E9 Canal Preliminary Design Project and authorize the City Manager to execute the agreement.